Tasks of WP2 en

From Coclico
Jump to: navigation, search

Tasks and deliverables :

  • T2.1 Convergence
    • DL2.1 Not specified
  • T2.2 Specification of an interchange format
  • T 2.3 Implementation of the interchange format
    • DL2.3.1 Open Source Software "toolbox" to implement mechanisms of import/export with respect to GForge/FusionForge and Codendi – (T0+18)
    • DL2.3.2: Open Source software plugins to integrate into the DL2.3.1 toolbox third party tools to make conversion of the navige exchange formats for the project artefacts – (T0+24)
  • T2.4 Integration of results of the Helios project
    • DL2.4.1: Open Source tool for the conversion of bugs databases between bugtrackers and corresponding plugins to integrate them into the DL2.3.1 toolbox – (T0+24)
  • T2.5 Dynamic Interoperability
    • DL2.5.1: Software prototype allowing the evaluation of the dynamic interoperability between forges, based on the DL2.2 specification – (T0+24)
    • DL2.5.2: Document of specification of extensions to DL2.2 for its use in a dynamic context – (T0+18)
  • T 2.6 : Features for forges federation
    • DELIVERABLE DL2.6.1 Study and definition of interchange format compatible with OAI-PMH (T0+9)
    • DL2.6.2 Implementation of a component allowing different forges to make their content accessible to OAI compatible harvesters. This component must take into account access rights(T0+12)
    • DL2.6.3 Setting up a portal allowing federation of different forges. (T0+21)
    • DL2.6.4 Setting up a portal where each user may find his/her own micro search engine indexing projects of own interest (T0+24)
Personal tools